您的浏览器版本过低,为保证更佳的浏览体验,请点击更新高版本浏览器

以后再说X
Welcome!
+86 4008007775

Industry Status

78e820c954545d1bb15ade0f613fb6c.png

On site homework supervision

  • On site personnel's illegal behavior cannot be supervised, and there are potential safety hazards in the operation;

  • Key personnel do not match the plan, the situation of cadres leaving their posts is unclear, and it is difficult for the dispatch center to inspect and command in a timely manner;

Homework process control

  • The location of the operators is not known: during the V-shaped skylight period, it is impossible to determine whether the personnel have engaged in cross line operations;

  • Operation steps are not mastered: in the standardized operation, the dispatching center cannot know the operation progress and completion;

Homework quality inspection

  • The homework process is not fully recorded, and the quality of the homework cannot be analyzed;

  • The number of homework videos is large and disorderly, and the efficiency of reviewing and analyzing homework videos is low;

Entry and exit management of homework gate

  • The operation door for personnel entry and exit does not match the plan: the location and time of entry and exit are highly arbitrary;

  • There is no record of personnel entering and exiting the work gate, and there is no basis for safety accident investigation;

Solution Introduction - Solution Construction Objectives

d894e400da0df7dec2058bbf7671ccb.png

Solution Introduction - Content of Solution Construction

f6abef04faf93c05de805724651d063.png

Scheme Introduction - Hailian Command and Dispatch Platform

Dispatch and command

  • The Hailian Command and Dispatch Platform is a platform that integrates personnel positioning, cluster intercom, voice conferencing, video surveillance, video calling, instant messaging, terminal control, and intelligent AIThe audio and video command and dispatch service system can meet the daily management and interaction needs of the railway industry, such as operation monitoring, personnel tracking, command intercom, equipment inspection, etc.

  • Supporting the national standard GB28181, it can integrate crossing videos, station monitoring equipment, etc., to meet the scenario of "video integration, one screen full view" for railway users;

  • Support the integration of multiple forms of intelligent devices, including camera flashlights, camera headlights, control balls, drones, etc., enabling a system to manage a variety of devices;

  • Support distributed architecture, capable of simultaneously connecting and managing over 1 million devices, meeting the needs of flat scheduling and command across all railway bureaus and specialties;163c21bb0d2b45cdc3e8a19bd172268.png

Scheme Introduction - Network Topology Diagram of the Hailian Command and Dispatch Platform

68203bf9afe09adf29704aacf6dfee3.png

Scheme Introduction - Function Set of Hailian Command and Dispatch Platform

Platform capability

  • Supporting intelligent analysis, it can perform big data statistical analysis on trajectory, upload, and login, and achieve dynamic display on a large screen

  • Based on functions such as voice communication, video feedback, and real-time positioning, achieve "reachable, visible, and adjustable" communication

  • Intelligent interactive experience enables easy video classification, video review, and video analysis

  • The system interface is open, allowing for deep coupling of railway unit functions and services, and customized development to meet the railway's own application scenariosff62c0c2de0bd4a21094a086e69d5f4.png


Scheme Introduction - On site Operation Control

17a71cc8ef1e72edb9c19ff66b85fd0.png

Scheme Introduction - Key Personnel Control

Key personnel verification

  • Import key personnel information, including facial data, according to the homework plan

  • During the roll call and completion meeting stages, the recorder takes photos of key personnel and uploads them

  • The system uses AI face comparison technology to verify key personnel information, and provides reminders when actual personnel do not match the plan

  • Remind when the facial data of key personnel before and after network access is inconsistent

ff9020ed2df69b84ee9399b9850735e.pngb40f4f12830798d19442e553634bcc3.png

Introduction to the Plan - Access Control for Homework Doors

Entry and exit control of homework gate

  • The plan will be automatically issued to the recorder, along with the corresponding operation door lock number and up/down time

  • Entering and exiting the network, the recorder terminal will allow the opening of specific door locks within a specified time range according to the job plan, and report the unlocking operation and time to the platform

fbf0e3803c64dbeefa5f5bfb340ade9.png

Scheme Introduction - Homework Log

Homework log

  • Record the entire process of the assignment on video and correspond it to the corresponding assignment plan, and check the current progress in real-time

  • Complete records of personnel arrival and departure information for each homework plan are kept, and can be quickly accessed through the homework plan

  • Real time reporting of all entry and exit operation doors during the homework process, clearly distinguishing non planned operation doors, non operation time periods, and other violations

  • Any violations discovered during the homework retrospective analysis process can be recorded as violations, and the corresponding violation records will be associated with the homework plan and imported into the problem library

  • Timely record and summarize problems discovered, achieving diary entry, weekly summary, and monthly assessment2093f1eb43b1d527f32e6126b8af62a.png


Scheme Introduction - Collection of Homework Data Information

a04a1d069c3ff250024f6cb1d1e782b.png

  • Homework data collection: real-time monitoring of the progress of the entire homework section                                                                                              

  • Partition display: number of completed assignments, completion rate, etc               

  • Key personnel: Rolling display of on-site photos, corresponding placement for network access and exit

  • Workshop work area operation sorting: visually display the comparison situation of the workshop

  • Equipment situation: Sort the online duration to timely grasp the application status of the equipment


  • Satellite Map: Realistic Restoration of Regional Conditions

  • Route data: Accurately display route information and obtain kilometer markers

  • Surrounding area of the route: delineated within a range of 100 meters and 500 meters


  • Accurate positioning: personnel positions are accurately displayed on the track of the line

    Equipment status: Real time display of personnel offline status


Introduction to the Plan - Engineering and Passenger Operations

0e83cb990479b46675f5cd113910f60.png

Introduction to the Plan - Engineering and Passenger Operations

  • Electronic ride assignment: Dispatch center will handleAdvance the plan for adding inspection dataSend it to the ride sharing software. Additional personnel are working on itDuring the business process, the handheld tablet reading plan,Quickly record the problem points and add them after completionProvide feedback to the dispatch center as soon as possible.

  • Program benefits:

  • Additional passengers: Combined with railway kilometer markingsFunction, given before reaching the boarding pointReminder, ensure that all necessary inspections are carried out;

  • Management personnel: Once the ride is completed, you will receiveRetrieve the details of daily rides and quickly check them outFocus on inspecting the actual situation in the region and improving work efficiency.cbc04a8e2d893f469b82994240516bf.png


    Scheme Introduction - Equipment Full Cycle Maintenance Management

Full cycle maintenance management of equipment


  • Due to factors such as multiple points, long lines, and scattered equipment, there is a discrepancy between production plans and actual operation content in the maintenance of railway switch equipment, resulting in equipment failureThe problem of missed inspections or excessive repairs. In response to these issues, this plan combines job recorders and related supporting equipment to achieve job supervision.

  • With transportation production as the center and safety production as the focus, we always implement the policy of safety first and prevention as the main approach. Through "one machine recording the entire process, one image viewing the whole"The maintenance operation record system of "Duan" realizes intelligent operation supervision, convenient operation, and improves the production safety level of the entire section.


cda6a92b76be899a811d46ae38fc17e.png

Scheme Introduction - Equipment Full Cycle Maintenance Management

e3467e91f75671c5ef33487935f3764.png

Program Introduction - Platform Capability

cf6070fed0778194d54134f67b39dc7.png



Copyright © 青岛海信移动通信技术有限公司 All rights reserved. 备案号:鲁ICP备05027830号-1